
THE MOVE TO WATER PAYS FOR NORWAY’S RAANAASFOSS HYDRO PLANT OPERATOR
The water-lubricated SXL turbine guide bearings Thordon installed as part of the re-powering of Norway’s Raanaasfoss 1 Hydro Plant have experienced almost zero wear after 23,887 hours of continuous operation on the first installed unit.
(Para visualizar toda la información descarga el PDF)
5 comentarios en «Hydro 2019»